超高压水除锈技术及其阶段性方程

薛胜雄 王乐勤 彭浩军 樊毅斌 陈正文 王永强 于雷 朱华清

薛胜雄, 王乐勤, 彭浩军, 樊毅斌, 陈正文, 王永强, 于雷, 朱华清. 超高压水除锈技术及其阶段性方程[J]. 高压物理学报, 2004, 18(3): 283-288 . doi: 10.11858/gywlxb.2004.03.015
引用本文: 薛胜雄, 王乐勤, 彭浩军, 樊毅斌, 陈正文, 王永强, 于雷, 朱华清. 超高压水除锈技术及其阶段性方程[J]. 高压物理学报, 2004, 18(3): 283-288 . doi: 10.11858/gywlxb.2004.03.015
XUE Sheng-Xiong, WANG Le-Qin, PENG Hao-Jun, FAN Yi-Bin, CHEN Zheng-Wen, WANG Yong-Qiang, YU Lei, ZHU Hua-Qing. UHP Waterjet Remove Rust Technology and Its Stage Equations[J]. Chinese Journal of High Pressure Physics, 2004, 18(3): 283-288 . doi: 10.11858/gywlxb.2004.03.015
Citation: XUE Sheng-Xiong, WANG Le-Qin, PENG Hao-Jun, FAN Yi-Bin, CHEN Zheng-Wen, WANG Yong-Qiang, YU Lei, ZHU Hua-Qing. UHP Waterjet Remove Rust Technology and Its Stage Equations[J]. Chinese Journal of High Pressure Physics, 2004, 18(3): 283-288 . doi: 10.11858/gywlxb.2004.03.015

超高压水除锈技术及其阶段性方程

doi: 10.11858/gywlxb.2004.03.015
详细信息
    通讯作者:

    薛胜雄

UHP Waterjet Remove Rust Technology and Its Stage Equations

More Information
    Corresponding author: XUE Sheng-Xiong
  • 摘要: 水能生锈,也能除锈。以200~250 MPa的超高压纯水射流进行了除锈自动作业和防止返锈的一系列试验研究。阐述了高压水射流除锈这一成套设备创新技术,并对射流形成、流场模型和作业效率给出了各自阶段性的数理方程。试验证明:本课题参数优化,满足了实际作业的需要。

     

  • Xue S X. High Pressure Water Jet Technology and Application [M]. Beijing: Machinery Industry Press, 1998. (in Chinese)薛胜雄. 高压水射流技术与应用 [M]. 北京: 机械工业出版社, 1998.
    Summers D A. Waterjetting Technology [M]. New York: E FN SPON, 1995.
    SSPC. Surface Preparation Coalings Handbook [Z]. Pisbury, 1994.
    Hlavagova I M, Hlavag L M. Quick Method for Determination of the Velocity Profile of the Axial Symmetrical Supersonic Liquid Jet [A]. 10th American Waterjet Conference [C]. Houston, US: WJTA, 1999: 189-200.
    Hlavagova I M, Hlavag L M. Research of Waterjet Interaction with Submerged Rock Materials [A]. 2001 WJTA American Waterjet Conference [C]. Minneapolis, US: WJTA, 2001: 617-624.
    Wang Z M. The Numerical Simulation on the Flow Structure for Ring-Shaped Jet Field [A]. High Pressure Waterjet Technology Research on Oil-Gas Wall Engineering [C]. Dongying, Shandong: Petroleum University Press, 1998. (in Chinese)
    汪志明. 圆形射流流场流动结构的数值模拟 [A]. 油气井工程高压水射流技术研究 [C]. 山东东营: 石油大学出版社, 1998.
    Schmid R. Ultra High Pressure Waterjetting for Coating Removal [A]. Proceeding of 10th American Waterjet Conference[C]. Houston, US: WJTA, 1999: 895-902.
    Louis H. Experimental and Theoretical Investigation of the Decoating Process by Pure Waterjet [A]. Proceeding of 10th American Waterjet Conference [C]. Houston, US: WJTA, 1999: 695-706.
    Xue. Difference and Similarity of Glue Removal for Airport Concrete Runway and Bilumen Runway [A]. Proceedings of the 2001 WJTA America Waterjet Conference [C]. Minneapolis, US: WJTA, 2001: 589-600.
    Frenzel L. Continuing Improvement Initiatives of Surface Preparation with Waterjetting [A]. Proceeding of the 9th American Waterjet Conference [C]. Houston, US: WJTA, 1997: 697-716.
    Kim Thomas J. An Overview of Waterjet Fundamentals and Applications [M]. Saint Louis, US: Water Jet Technology Association, 2003.
    Kunapom S. Mathe matical Modeling of Ultra High Pressure Waterjet Peening [A]. Proceeding of the 2003 American Waterjet Conference [C]. Houston, US: WJTA, 2003.
    Eng. Luis E. Comparision of Surface Preparation Using Different Methods [A]. Proceeding of the 11th American Waterjet Conference [C]. Minneapolis, US: WJTA, 2001: 745-763.
  • 加载中
计量
  • 文章访问数:  8104
  • HTML全文浏览量:  492
  • PDF下载量:  952
出版历程
  • 收稿日期:  2004-04-09
  • 修回日期:  2004-06-21
  • 发布日期:  2004-09-05

目录

    /

    返回文章
    返回